Integrated Sciences & Engineering Building (IS&E) - In Progress

The proposed CSUSM Integrated Sciences and Engineering (IS&E #36A) is a new 70,000 GSF/47,655 ASF building that will provide state of the art facilities for teaching, learning, and research, featuring integrative innovative technology and flexible configurations for classrooms and laboratories. The project site is an undeveloped, 2.46-acre area east of the campus core adjacent to an existing hillside. The proposed project requires re-routing of an existing service road, construction of a retaining wall and a 750’ underground utility tunnel extension. Other on-site improvements include a loading area, high-capacity passenger elevator, landscaping, exterior lighting, emergency generator, building and wayfinding signage, fire lane access, fire hydrants, and trash enclosure.    

The proposed project will support four new departments, Electrical Engineering, Computer Science, Systems Engineering and Software Engineering within the College of Science, Technology, Engineering, and Mathematics (CSTEM).

The approval of Phase 1B, IS&E #36B building, to sought at a later date. Please check back for project updates. Final Mitigated Negative Declaration

The Final Mitigated Negative Declaration can also be viewed at the CSUSM Office of Planning, Design & Construction during regular business hours, located at 411 La Moree Road, San Marcos, CA 92078

Please check back for project updates. 

Final Study - Mitigated Negative Declaration

Notice of Determination (NOD)

The appendices are available upon request and can also be viewed at the CSUSM Office of Planning, Design & Construction during regular business hours, located at 411 La Moree Road, San Marcos, CA 92078

Project Manager: 

Bryan Licht